CZPT Gear Pump for CZPT Extruders
CZPT Parameter for CZPT CZPT Pump:
Material for CZPT Pump Body: High Temperature Tool Steel or Chrome-Nickel Steel
Material for Gear: High Temperature Tool Steel or Nitrided Steel
Material for Sliding Bearing: High Temperature Tool Steel
Benifits of melt equipment pump:
CZPT pumps can make extrusion lines run continually and successfully,enhancing item good quality, extrusion line steadiness and minimizing energy intake.
CZPT pumps play a crucial part in the extrusion process by sustaining exact output control and enhancing solution quality and are commonly applied in chemical substances, fiber production, movie, sheet, profile, pipe and pelletizing and many others.
Finished merchandise show
CZPT data
Type | Quantity (cc/r) |
Max rotary Pace (r/min) |
Outlet pressure (MPa) |
Inlet pressure (MPa) |
Flow rate L/h | Temperature | ||
Low viscosity 1-1000Pa·s |
High viscosity 1000~8000Pa·s | CZPT-high Viscosity ≥8000Pa·s |
||||||
GM-ME-5 | 5. | a hundred | ≤35 | ~thirty | ≤20 | ≤12 | ≤8 | ≤350ºC |
GM-ME-7.5 | 7.five | 100 | ≤35 | ~thirty | ≤20 | ≤18 | ≤10 | |
GM-ME-10 | 10 | 100 | ≤35 | ~30 | ≤20 | ≤25 | ≤15 | |
GM-ME-twenty | 20 | ninety | ≤35 | ~30 | ≤80 | ≤40 | ≤24 | |
GM-ME-31.5 | 31.five | 90 | ≤35 | ~thirty | ≤150 | ≤80 | ≤42 | |
GM-ME-50 | 50 | eighty | ≤35 | ~thirty | ≤220 | ≤120 | ≤70 | |
GM-ME-seventy five | 75 | 80 | ≤35 | ~30 | ≤280 | ≤180 | ≤90 | |
GM-ME-one hundred | one hundred | eighty | ≤35 | ~30 | ≤350 | ≤230 | ≤120 | |
GM-ME-a hundred and sixty | one hundred sixty | 80 | ≤35 | ~30 | ≤550 | ≤350 | ≤175 | |
GM-ME-two hundred | two hundred | eighty | ≤35 | ~30 | ≤700 | ≤450 | ≤250 | |
GM-ME-250 | 250 | 80 | ≤35 | ~thirty | ≤800 | ≤600 | ≤300 | |
GM-ME-355 | 355 | 80 | ≤35 | ~thirty | ≤1000 | ≤750 | ≤350 | |
GM-ME-five hundred | five hundred | sixty | ≤35 | ~thirty | ≤1500 | ≤1000 | ≤500 | |
GM-ME-750 | 750 | 60 | ≤35 | ~thirty | ≤1850 | ≤1500 | ≤750 | |
GM-ME-a thousand | 1000 | 60 | ≤35 | ~30 | ≤3000 | ≤2000 | ≤1000 | |
GM-ME-1600 | 1600 | fifty | ≤35 | ~thirty | ≤4000 | ≤3000 | ≤1500 | |
GM-ME-2500 | 2500 | fifty | ≤35 | ~30 | ≤6000 | ≤4500 | ≤2200 | |
GM-ME-3150 | 3150 | fifty | ≤35 | ~30 | ≤7000 | ≤5200 | ≤2600 | |
GM-ME-4000 | 4000 | 40 | ≤35 | ~thirty | ≤8000 | ≤6000 | ≤3000 | |
Remark:the melt gear pump flow is associated with the work speed, material viscosity, pressure, So the model selection please ask for us. |
Software show
CZPT inspection
We take only first-class steel and check every production procedure to ensure every dimension is produced precisely. A final complete inspection will be executed before delivery.
Commissioning
We provide the operation manual for customers to gudie to install the screen changer, and at the requirement of user, salers should send technician to install and commissioning the die at site of Buyers, expenses of the trip should be borne by Buyers.
Following-sales service
12 months with proper operation by user, all the spare parts shall be replaced free of charge under guarantee period, fee for transportation and packing will be borne by users.