696 Psi-46400 Psi Range Air Driven Liquid Pump

696 Psi-46400 Psi Range Air Driven Liquid Pump

CZPT Parameter of CZPT
 

CZPT Identify Gasoline-Liquid Booster Pump
Model M-4
Booster Medium Lquid
Pressure ratio four:1
Outlet pressure 32bar
464 psi
Movement L/Min 14.eighty one
connections CZPT connection G3/8”
Inlet OG1”
Outlet ZG1/2”
Net excess weight KG 4.eight
CZPT situations Export CZPT fumigation picket situations

Solution introduction

M-Sequence air driven liquid pump makes use of a created-in pneumatic handle 4-way two-position valve to go to and fro immediately. This series of merchandise is created by introducing associated technologies overseas and planning according to the CZPTs of our country. The air pushed parts are all made of aluminum alloy and are dealt with with oxidation. The pump head is made of carbon steel or stainless steel according to distinct media.

Solution Details

The diameter of the push piston of this series is up to 80mm, air pressure≤8bar. 

This sort of pumps has the pursuing attributes:

Gentle bodyweight, transportable design 
Huge flow, extensive pressure range
Apt to handle, both handbook and automated controls are available.
Appropriate for most fluid
No electric power is needed. 
Effortless to maintain

Main complex data 

Typical technological data for M sequence air driven- booster pump  
 

Sort Stress ratio Outlet strain Flow
one/Min
Connections Internet bodyweight KG
bar psi generate connection Inlet Outlet
M4 4:1 32 464 fourteen.eighty one G3/eight” G1″ ZG1/two” four.eight
M10 10:one 80 1160 seven.07 G3/eight” ZG3/four” ZG1/two” four.3
M16 sixteen:1 128 1856 4.55 G3/eight” ZG1/two” ZG1/2″ four.two
M30 thirty:one 240 3480 2.22 G3/eight” ZG1/two” ZG3/8″ four.2
M44 44:1 352 5104 1.36 G3/8″ ZG3/eight” ZG3/8″ 4.1
M64 64:one 512 7424 .seventy two G3/8″ ZG3/eight” ZG3/8″ four.one
M100 a hundred:one 800 11600 .forty eight G3/8″ ZG3/eight” M14X1.five 4.1
M170 170:one 1360 19720 .28 G3/eight” ZG3/eight” M14X1.five 4.one

Our manufacturing unit

FAQ

one. Delivery CZPT: FOB HangZhou, by vessel
two. Shipping and delivery Time: 15-20 days
3. Payment CZPTs: T/T (one hundred% to pay out by T/T )
four. Installation / Procedure / Service / Guide: In English
five. Guarantee: A single yr from the day of completion of the commissioning.
six. Pre-cargo Inspection: Supplier must trial run total line at supplier’s factory just before shipment.

About transport

Fumigation wood instances, which are properly sealed and powerful sufficient for lengthy-time period journey, and ideal for multi-moments loading & unloading by forklift.

 

696 Psi-46400 Psi Range Air Driven Liquid Pump